Eatwell Farm

View Original

Finishing Touches

P8070023
Last Friday an electrician and Brandon from Eaton Pumps in Woodland was putting the finishing touches to our well repair and upgrade. The well now has a new 10" casing. The water supply for our greenhouse use now outputs into a 5,000 gallon tank from which it is pumped by a 3hp pressure pump. We have more water available and at a higher pressure. We are using water from the irrigation canal for our crops. In the winter water from the canal is not available so we will use the well to give us 250 gallons per minute to irrigate our crops as and when needed.